
Add to Cart
Bendable High-Rise Building Irregular Space Decoration MS Rammed Earth Board
The construction process of rammed earth panels is simple and quick to install, and the construction time of real rammed earth is directly reduced by 80%~90% compared to that of real rammed earth, which can greatly shorten the construction period. Local breakage, only need to replace the plate, simple and rapid, easy maintenance. The installation of rammed earth panels is very convenient, the best installation plan is in-line nail installation and structural adhesive installation, the building exterior walls are in the form of dry hanging, landscape walls are in the form of dry hanging or paste installation. Interior walls cannot use gypsum board for the base layer, because there is paper surface on the surface of gypsum board, which leads to unstable paste. During the construction, it is necessary to ensure that both the base surface and the sizing surface of rammed earth board are free of dust. The seams on the surface need to be repaired by soil application, and the cracks need to be filled and repaired by thin slurry injection and soil curing agent yellow clay smear slurry. Because the rammed earth board has a certain thermal expansion and contraction of wet and dry characteristics and elasticity, in order to prevent later deformation or chipping, to be in between two different rammed earth board, leaving a gap of 3 ~ 5 mm.